Friday 27 May 2016

Euen denies his unrealistic plan for a "Yamba Super-Port" includes a coal loader or bauxite moving through the port


An short anonymous online snippet under the pen name "Maclean" in The Northern Star on 14 April 2016 included this photograph of Desmond John Thomas Euen (far left) with the Australian Deputy-Prime Minister and MP for New England Barnaby Joyce:


The photograph appears to have been taken at one of the Lismore bowling clubs on an unspecified date and the published snippet (possibly penned by Mr. Euen himself) contained no real details of what the dour former Queensland truck driver told Barnaby Joyce about his personal plan for the small Port of Yamba.

However, a local reader told me on 25 May 2016 that when contacted Des Euen is once again "emphatically" denying there will be any facilities for coal loading in his plan for Yamba and that coal and bauxite will not be going through the port.

He claimed to this local reader that there had never been any plans for a coal loader or for bauxite to move through the port.

Des apparently said “no coal loading facilities”, “no bauxite loading facilities” and “that has always been the case.”

But only one week before his denial at least one version of the invitation to the so-called "summit" in Casino posted online by Euen included the statement: ”The dual capacity of Yamba Port and Pacific West Rail to provide a viable alternative route for the carriage of mineral resources emanating from Northern NSW and the lower section of the Surat Basin".

On 25 May that 4 May 2014 dot point was also still up on the AID Australia Pty Ltd website:


In his presentation to Moree Plains Shire Council on 12 June 2014 Euen is clearly expecting that his proposed rail network will potentially carry ore from the Muswellbrook, Glen Innes and Narromine rail heads to the Port of Yamba:


On 9 February 2015 and again on 26 May 2016 this dot point was sighted by North Coast Voices on the AID Australia Pty Ltd website:


Readers have been tracking some of the text changes Euen makes to the AID Australia website and are of the opinion that reference to a coal port found at http://www.aid-australia.com.au/competitive-edge/ is no longer directly accessible from the 'company' website homepage and is no longer included in the AID Australia's A “Key” Nation Building Infrastructure Plan Summit invitation.

Reference to the possibility that bauxite would be loaded from this new Yamba Super-Port can be found on the Australian Stock Exchange website where a gullible Queensland Bauxite Limited told the world it had been in talks with Mr. Euen.

Des Euen has also given similar assurances (no coal and no gas) to a member of the Clarence Forum:

NOTE: Mayor Richie Willaimson has again denied he supports Euen's port expansion plan.

To be frank, to date in the Lower Clarence there is scant belief in Des Euen's facile assurances about his personal plans for Yamba.

Plans which he has never deigned to publicly present and explain to the Yamba community - perhaps because he is afraid that his grandiose phantasy would be blown out of the water by local knowledge of the Clarence River, its estuary, physical environment and coastal approaches.

No comments: